Case studies

This text briefly introduces the content in the page.
UBY Environment

Vibration and noise monitoring

Vibration and noise monitoring Project Renovation of an office building for the European Space Agency in the centre of Paris, in a very densely populated, upmarket neighbourhood. The project is on a quiet, low traffic street. Duration : 8 months Challenge Monitor the level of vibration and noise for neighbouring buildings as required by the

UBY Environment

Pawtucket Tunnel project

UBY helps ensure a trouble-free experience for residents during the Pawtucket Tunnel project

UBY Structure

Fécamp Offshore Wind Farm

UBY monitors the structural condition of several wind turbines throughout their lifecycle at sea.

UBY Safe

Lille Europe Railway station

UBY monitored air quality and worker geolocation to ensure safety during the Lille-Europe station renovation project

UBY Soil

Bouygues Travaux Publics Région Parisienne: Mantes la Jolie railway viaduct

Waste traceability – Mantes-la-Jolie railway viaduct worksite Project An 800-meter long viaduct is being built at the Mantes la Jolie station as part of the Eole project, dedicated to the extension of the RER E line to the west. The aim of this viaduct project is to improve the flow of trains at this station,

Do you want to boost your business today?

This is your chance to invite visitors to contact you. Tell them you’ll be happy to answer all their questions as soon as possible.

Téléchargez notre livre blanc

Anticiper, comprendre et atténuer les nuisances de chantiers